Sorry, seems very clearly I was wrong there. I knew that the process with two storage locations is possible, but I assumed technically it works the same way as with the delivery based production integration, without testing it.
Brgds
Juergen
Sorry, seems very clearly I was wrong there. I knew that the process with two storage locations is possible, but I assumed technically it works the same way as with the delivery based production integration, without testing it.
Brgds
Juergen
Hi All,
We are trying to archive spool logs and want to use object type DRAW to be assigned to a document type, but DRAW is not present in EWM, has anyone come across this situation and know why there is no DRAW object type in SAP EWM.
Regards
MS
Hi,
Here we have two concepts 1. logical system 2. business system
Logical systems use to connect the RFC destinations for delivery processing through distribution channel.
one ECC logical system connect to multiple systems.
Ex : from ECC , one side we can connect to CRM & other side we connect to EWM also.
Business system can present in EWM only and it can be used to process the deliveries in EWM once after distributed as per the RFC destinations.
C K Reddy
Ok...Thx for the inputs.
Hi Rajeev,
Pls check whether the BADI implementation (/SCWM/SR_PRINT_WAYBILL_CMR) is active.
Regards,
Prince
Hi Khushboo,
I'm facing the same problem. Have you been able to resolve this issue? Message NP230 might cause DDIF_TABL_ACTIVATE to cancel activation. However, other VAS Structures are generated despite reusing the field name CAT.
Regards,
Jochen
Hi Franz/Laszek,
Is your project live with EWM MFS? If yes, was there any specific risk/challenge you faced doing so?
Also, is it possible to have multiple resources to manage MFS or it needs a development?
please advice.
Thanks for your reply Joerg.
Regards
Ramesh.R
Hello Experts
Quick question. Is it possible to change storage type for a storage bin using transaction /SCWM/LS02?
Is there any config that needs to change to achieve this change?
Any help is appreciated.
Thanks
Ankit
Thanks for your reply, since DRAW does not exist in SAP EWM, we have already used DOCUMENT as object type to archive spool logs, but was curious to know, why there is no DRAW object type in SAP EWM.
Hi Sheth,
As far I know its not possible to change. Do we need to delete.
if you want to do so delete the bin and recreate the bin with new storage type.
Note if you want to delete it should be empty bin.
Regards
Suraj
Hi,
In addition to Suraj, empty bin means not only the stock and should not contain any open WTs also.
C K Reddy
Hi Ramesh,
The stock is available in EWM? Did you finish the GR?
When I need to reverse the GR I usually do it from ECC. But you can only do it if you have the material document created through the movement type 101.
I usually create the 102 movement in MIGO with the reference of the material document, select the option "via delivery" and create a outbound delivery in EWM.
Kind regards,
Anderson
Error: Delivery XX Item xx: Putaway WT created (cancellation/reversal not poss.)
Ramesh.R
Hi Anderson,
In EWM once you complete the Goods Receipts you can Reverse GR, but the final Putaway should not be completed.
Regards
Ramesh
Hi,
please refer to a consulting note which was released as impact of a customer connection program.
the note shows ways to reverse goods receipts, please check note 2178045.
I understand many resons to reverse are also related in ERP objectsk like wrong price, wrong contract etc, so a simple reversal in ERP is sufficient. Also this is described in the note by setting up new movement types.
Regards
Jörg
Hello Markus
Thanks for the response!
I am currently following the process you have mentioned ,ie rejecting deliveries in /SCWM/PRDI.
As far as selecting Process Codes is concerned (I001,I004....) <I am not sure of the config/ABAP Code that is present so that whenever I am selecting Item Type IDTR it shows just I001 in the Process Code drop down which I want it to set to.
Similarly for Item type IDLV it shows just I004 in the process Code dropdown.
I am setting process code for 150-200 line items in a week roughly using /SCWM/PRDI.
Thanks
Akhil
Hi CK,
I have done with basic config and defined 4 CP. Now , I want to simulate this with task creation.
which FM will trigger (simulate) task for PLCs from above?
Please advice
Hi,
if you click on the "Reject" button on header level you must not enter a process code. This is automatically done (I think "I004 Reject Inbound Delivery" is used).
Also this works automatically for all items. Therefore I do not understand why you want to use the process code dropdown on item level?
200 line items is not much, so should be ok.
I think the main question is if it is ok for you to reject the complete delivery (with all items) or not.
If you wish to close only specific items (and not all) then you can not use the "Reject".
Best regards
Markus
Hello Markus
I am setting Process Codes mainly at the Item level as I mostly dont need to reject whole of the delivery.
Also I dont want to set I001 for all of the item Types. My requirement is as below:
Also sometimes as far as volume is concerned sometimes the volume goes to almost 2000 line items .
That's why I am finding a way to set Process Code in MASS.
Thanks
Akhil