Hi Faical,
Kinldy assign the number range value to the item type defined.
regards,
Praveen
Hi Faical,
Kinldy assign the number range value to the item type defined.
regards,
Praveen
Hello Saby,
Once putaway task is confirmed you cannot cancel the task.
you can reverse the GR process step if you do not work with task process.
Regards
Sastry
Dear All , Thanks a lot for your kind guidance and help.
Issue is resolved , cause of issue : GI-ZONE was not created for storage type 9020.
Thanks
Jinoy
Dear All , Thanks a lot for your kind guidance and help.
Issue is resolved , cause of issue : GI-ZONE was not created for storage type 9020.
Thanks
Jinoy
Hi people
I figured the S159 table issue.
It is got to do with delivery type, my stock transport order delivery does not update in S159 whereas sales order based delivery updates.
But still I am not able to create a wave.
Can anyone please give me a functional flow of the process, maybe I can figure out the issue.
Dear All ,
Greetings for day , Thanks in advance for your kind cooperation
Kindly guide steps to achieve full pallet picking functionality in EWM.
I don't have option 5 in WPT config .
Thanks
Jinoy
Yes Craig,
Its against Sales Order...
Hi Mrinal,
You can explore options with SAP MM/IM and lean WM. EWM require to know the content of the HU / box else it will be just receiving packaging material and shipping out the packaging material.
Thanks,
Aravind
It won't save the actual date calculated. Technically the "date" is not a selection parameter. Only the minimum number of days is. If you where to change the selection criteria in the sales order, you would be changing the number of days.. I.e. you have a value of 90 days minimum shelf life required in the batch determination procedure. Lets say you reduce that to 60 days in the sales order cause the customer agrees. New batches are selected based on the new, calculated date. The calculated date is not saved. The new selection parameter of 60 days should be.
Craig
Hi Experts
Does Client copy work in EWM?
As we copy whole client in ECC for training or any other purposes, can we do the same in EWM? Does it work?
Why am I asking this, as logical system will be difefrent in new client and all the integration done between clients and business partner in EWM will have reference of old logical system.
Has anybody tried this?
Thanks
Dear Sabyasachi ,
I think we need to consider integration aspect as well here , if you are creating new client respective
changes in integration and client assignment needs to be carried out so that ECC Points to correct EWM system.
ECC ---> EWM , One to one relation between ECC and EWM .
At any point you need to setup client and logical system appropriately to have respective integration flow.
ECC - EWM1 ( Client Copy of EWM )
ECC1 copy of ECC - EWM1 (Client Copy of EWM )
In both cases integration needs to be setup appropriately. Please try same and revert incase of any querys.
Thanks
Jinoy
Dear All ,
Kindly guide me as how to achieve full pallet pick functionality as i dnt have option " 5 " round whole units at storage type.
Thanks in advance.
Jinoy
Kindly guide.
Hi,
All the Configurations will work. if you do the below.
you have to build complete Integration of ECC-EWM and, you have to replace new logical system all the places where you would be setting of Logical system based configuration.
Example:
Business Partners Identification,
Storage Location Mapping.. Etc.
Hello Ahmed,
Did you wrote EWM Certification exam ?
Do you have any Questions or tips for the exam ?
Thanks & Regards.
Nizamudin
Hello Juergen,
Did you wrote EWM Certification exam ?
Do you have any Questions or tips for the exam ?
Thanks & Regards.
Nizamudin
hi Satish,
How do you update all identification of BP in EWM ? Mass and LSWM does not work. Is there is standard program?
we have around 15K BP
Thanks
Hello,
Can you just try to do some Trials using MASSD Tcode. It should support.
Regards,
Sathish