Quantcast
Channel: SCN: Message List - SAP Extended Warehouse Management (SAP EWM)
Viewing all 5578 articles
Browse latest View live

Re: HU task creation

$
0
0

Hello Steve,

 

It is not possible to create again a HU task for the same HU.

Is it in MFS area?

 

Regards,

Jobi


Re: HU task creation

$
0
0

Hello Johann, Petr, Jobi,

 

 

I haven't blocked the HU.

This is in MFS area. We can keep 4 handling in the bin.2 HU in the front side of the bin 2 HU in the back side of the bin.  we create WT for picking these HU's. we have issues when crane tries to remove the HU from the back side of the bin. we need to remove front HU's first and keep somewhere. an open task is waiting for the removal later for this

question is,

how to move the front bin HU without cancelling the open tasks?

Regards

Steve

Re: HU task creation

Re: CHBA exception not available

$
0
0

Hi Priyank,

 

i have the CHBA exception code in the Standard also.

The following note will help you:

 

1341944 - Missing delivery Customizing

 

Much success

 

Johann

Re: HU task creation

$
0
0

Hi,

 

can you identify your removal rule and specific pick sequence in the system and put the HUs into the BIN physically in a way the front HU will be picked as a first? I suppose your system picks HUs within a BIN in ascending order, is that correct?

What may influence that sequence? Is there any dynamic variable?

Are you able to adjust putaway rule to match the desired removal sequence?

 

Regards,

Petr

Re: Unable to Delete BIN

$
0
0

Hi P@M,

 

check out whether you have open warehouse Tasks to the storage bin. Otherwise a maintained fixed storage bin is the problem.

You can delete the assignement with transaction /SCWM/FBINDEL.

 

Regards

Johann

PPF action created for putaway WT

$
0
0

Dear Experts,

 

I'm trying to use this PPF but  it isn't work fine.

 

I access the transaction SPPFCADM and verify that alread been the customizing for this PPF, but I'm trying to insert the parameters for my documents or warehouse and I'm not  finding the field to fill.

 

I saw there is some customizing in EWM > Cross Process Settings > Delivery Process > Action  , but I dont understand how to use the customizing.

 

I want to create my warehouse task after packing status and I tried to create the conditions table with this field but I dont have success. Ths system not allowed create the table condition.

 

If somebody has some document where can I try to follow would be nice or any asnwer will help me.

 

 

Thanks for your help.

 

Follows my shoots screen:

Re: Handling Unit Lost Stock Reference

$
0
0

I try to do but the field reference isn't open to fill the data, thanks for aswered.

 

Regards

 

Alan


Re: PPF action created for putaway WT

Re: EWM Function Module for Pack HU

$
0
0

Hi Shrinivas,

 

Try this interface class:  /SCWM/IF_PACK_BAS has most methods used for packing.  this will help you create, pack, move HU, etc...

 

Thanks,

FC

Delivery quantity adjustment prior to Goods receipt

$
0
0

Hi,

 

ASN quantity is 100 PCS in 10 HUs and received quantity is 95 PCS, which makes short of 5PCS.

 

I have done simple unloading of all 10 HUs. During goods receipt process in /SCWM/GR, one of the HU was short of 5 PCS. Hence  I was entering exception code I001/I002, to reduce the quantity. Here error message comes "Quantity adjustment is not possible due to confirmed quantity".

 

Is there any configuration needs to be done or any process has to be followed to resolve this,

 

Karthik

Re: Delivery quantity adjustment prior to Goods receipt

$
0
0

Hi Karthik,

 

you need to reverse unloading in order to adjust quantity. If you already done putaway for some items, no worry, after you unload again, you may continue with your work.

 

Petr

Re: CHBA exception not available

$
0
0

Hi John,

 

Yes, this is exactly what I did to make it work. Configured a new exception and named it CHBA, and assigned the internal CHBA to it. Though I didn't know this was available as a note. Thanks for sharing it.

 

But my understanding was that CHBA should have been available as a standard exception in the first place, and should not have required to be configured additionally.

 

I will keep the thread open for a little longer, to see if I can get any explanation on this. Thanks a lot for your inputs.

 

regards,

Priyank

No followup step in HU (Process oriented outbound process)

$
0
0

Hi everyone,

 

we use POSC in outbound process with the following steps:

  • NORM (Pick), automatic WT
  • PBGP (Packing), automatic WT, destination bin (PG00-0)
  • OB03 (Staging)

 

After pick confirmation (Tx /SCWM/TO_CONF) in the destination HU from Packproposal, the destination hu contains the open external step NORM. If we close the step on our workcenter (workcenter has step NORM in customizing, Tx /SCWM/PACK), the HU still has NORM as external step but the is closed and a HU-Warehousetask is created (via QRFC) to destination bin PG00-0 with external step PBGP.

After confirming this WT the HU is posted to PG00-0, but still has the closed external step NORM.

 

I would expect that the HU get external step PBGP with WT creation or with WT confimation.

 

Did I forget some customizing?

 

I am on EWM 9.1.

 

 

best regards,

 

Harald

Re: PPF action created for putaway WT

$
0
0

Hello Man !!

 

Thanks a lot for your tip. I got here just following the step by step .

 

 

 

Again thanks you help me a lot.

 

Alan Mattos


Re: PPF action created for putaway WT

$
0
0

Petr,

 

If possible you can send me the main page from help SAP where can I find the scenario where  I'm trying implement.

 

I'm looking for but I'm not find the main scenario for customizing.

 

Sorry for disturbing you again.

 

 

 

Regard

 

Alan Mattos

Re: master Capacity

$
0
0

Hi,

I am afraid Petr is wrong here. ERP has this capacity check, too, but it has nothing really to do with an HU (resp. it also works without HU).

This field comes from ERP. This capacity refers to a capacity check based on a capacity usage for a material or packaging material.

"1.  I want the field will not replace by ERP.  The field i will maintain in EWM;  and  the field will not be replaced by ERP"

Not in the standard. This field should be maintained in ERP, it will be transfered with any change you do in the material master to EWM (if you have an active CIF model, which you should always have).

"2. i can maintain the field in ERP, tnen  send to EWM  but how to do it ? i can not find the field in ERP"

When you maintain the material master, in any view (I believe), you select the button "Additional data", then the tab "units of measure" (and that you should see by the table you have in your screenshot). And there you maintain this capacity.

Brgds

Juergen

Outbound Delivery OTXT - Item Type Create Manually

$
0
0

Hello,

 

When i click on the Button "Create new Position" in the Outbound Delivery Order the OTXT Position is not in the List of Value.

 

is it possible to create a OTXT(Textposition) in EWM in a distributed Outbound Delivery?

 

Thanks for your help

Best Regards

Tobi

Re: master Capacity

$
0
0

Hi Jürgen,

 

you are technically correct. I was merely pointing out the HU capacity functionality is not in ERP (I wish it would be there].

 

Interesting.

Liu Tony, can you please share if you see capacity consumption column in additional unit of measure tab in material master?

 

In our system it does not appear. (MARM-CAPAUSE does exist in DB). We consider this information as warehouse specific, since more warehouses can use this dimensionless factor in different ways.

Therefore we do not CIF this information.

Technically of course it is possible.

 

Regards,

Petr

Re: Automatic Packing in EWM

$
0
0

Hi!

 

You should maintain determination procedure 0PAL.

2015-01-26_21-55-19.jpg

 

Then you should maintain determination packspec for each material in /scwm/packspec

Viewing all 5578 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>