Quantcast
Channel: SCN: Message List - SAP Extended Warehouse Management (SAP EWM)
Browsing all 5578 articles
Browse latest View live

Re: capacity check method 4

Hello, if I am not mistaken and do a simple math, then when you want to putaway first material in quantity 1500 and the capacity point consumption is 1,33 for each, then you reach the maximum capacity...

View Article


Image may be NSFW.
Clik here to view.

Re: Source fields for ECC Material CIF to EWM?

Thanks Claire and Alex.  I expected it would be MARA and I have been reading the EWM book (great source of info!).  But if any alternate UOM are included in the material data CIF to EWM, it seems that...

View Article


Reversal of GR/ Post 102 Movement after Final Putaway

Hi Gurus, Is there a way we can reverse a GR posting (101) / post 102 movement after Final Putaway i.e Creation of Putaway Warehouse Tasks -> Confimation of the Putaway warehouse tasks. I have...

View Article

Re: Reversal of GR/ Post 102 Movement after Final Putaway

Hi! If GR posting have been sending to ERP you cannn`t reverse it. You should create return delivery. BR, Alex.

View Article

Re: Reversal of GR/ Post 102 Movement after Final Putaway

Hello, Return PO -> Outbound Delivery -> ODO -> Pick -> Goods Issue in EWM -> Goods Issue in ERP Regards,Sathish

View Article


Re: Query on Slotting

Thanks a lot Juergen. Yes, I see that planned fields gets updated when we save slotting. I am now closing this thread.

View Article

Image may be NSFW.
Clik here to view.

ECC to SCM Vendor Master Transfer Issue

Hi, I am trying to transfer newly created vendor master from SAP ECC to SCM. I have created Integration model (T-code:CFM1) for just one vendor and selected Create Loc./BP = 2 (Create Both). After...

View Article

Re: ECC to SCM Vendor Master Transfer Issue

Can you check the Authorization of your RFC User.  Regards,Sathish

View Article


Re: capacity check method 4

Hi, Thanks for reply Petr and Manish. Mixed storage is allowed for storage type. Requirement is, To putaway two different materials in same fixed bin within bin capacity 2000 PC  material A has max qty...

View Article


Re: capacity check method 4

Hello Swapnil, in case mixed storage is allowed then you do not need to maintain any Mixed Storage indicator in your storage type master.If you want to restrict the bin capacity just by the capacity...

View Article

Re: capacity check method 4

Hi Petr, My issue is in WM and not in EWM. If my bin capacity is 2000 PC. Mat A : Max qty 1500  and Mat B: Max qty 500 and my TO has 2 materials with 3 line items as follows...

View Article

What Business functions required for for LE-WM stock upload in SCM 9.1

Hi All I am trying to upload stocks from LE-WM using transaction /n/SCWM/MIG_STOCK but ending up with an error "Interface was called incorrectly /SCMB/MDL_EXTPROD_READ & ERP RFC destination &...

View Article

Re: capacity check method 4

Thank you Swapnil, but as you wrote already, you have maintained capacity usage of 1,33 per unit. Then you putawayed 1500 x 1,33 = 1995 so, what is the issue?Simply decrease the capacity usage to 1.Is...

View Article


Re: capacity check method 4

Hi, After doing capacity usage as 1 , system is not restricting me to putaway for,quantity > 1500.

View Article

Re: capacity check method 4

Thanks Petr, You are correct. Now my question is If My Max Bin capacity is 2000. I have two materials with Capacity usage as 1 in material master. Then in 1 transfer order if this 2 materials are...

View Article


Re: Reversal of GR/ Post 102 Movement after Final Putaway

Hello, In EWM, GR can be reversed until the EWM ID status "DCO" is not set to 9.DCO status is set to 9 after final putaway task, except if you did activate "Putaway delay" which enable to set a delay...

View Article

Create dummy Outbound delivery order & Outbound delivery in EWM

Dear Gurus , Please suggest if following is possible in EWM and does not have any impact on ERP system : 1. On click of a button create ODO 2. Assign multiple components to this ODO3. Assign Wave and...

View Article


Re: Wave without Outbound delivery reference

Hi Juergen , Thanks for the reply. It will certainly help.  Please suggest if following is possible in EWM and does not have any impact on ERP system :  1. On click of a button create ODO 2. Assign...

View Article

Re: Wave without Outbound delivery reference

... No. Not in standard. What process should that be?Juergen

View Article

Re: Create dummy Outbound delivery order & Outbound delivery in EWM

Hi, This is very much possible. But can you explain the scenario further. Regards,Rajiv

View Article
Browsing all 5578 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>