Hi Phillippe ,
Thanks for reply.
But we want to consider the stock of other plant as Sales Order or Production Order will never get created for Plant 1000 , but specifically needs to be created in Plant 2000.
In turn when we pick the stock of Plant 1000 , its expected that EWM executes the posting change in background and transfer the stock from 1000 to 2000.
If we have one plant and multiple Sloc , then with availibility group flagging mandatory system perform sloc to sloc move automatically ..in same way it should also perform plant to plant move when configured stock determination.
thanks,
mahesh