Dear Gurus,
We have the below scenario Pick warehouse task is created from bin A which is supposed to go to Bin B. Instead of going to bin B directly it should always go via Bin C.
So the final path should be A ----C -----B
When I create pick task, system is able to trigger LOSC only when C is pick point because the pick task is a product warehouse task (destination
HU is blank) at the initial creation. System is bringing the entire source HU to pick point and asking us to break and remove partial pick from it at C.
But our requirement is we do not want to move full pallet from the bin A to bin C and instead would move partial pick from bin A directly, move to bin C and then subsequently to bin B.
Please guide with your valuable pointer for how to address the issue.
Regards,
Malay