Hello guys,
thank you very much for the responce and help. But what I'm really surprised about is that as long the stock type of materials in PMA does not match with the stock type of materials in PSA (F2 -availability group 001 vs P2 - availability group - 003 )....the consumption booking is not possible.
Have anyone tried to book the consumption from PSA, when the stock types of materials in PMA and in PSA are different? Is it possible at all?
I have 2 storage locations in ERP:
Location 1 is Availability Group 001 in EWM (Source-Storage for Staging)
Location 2 is Availability Group 002 in EWM (Production Supply Area for consumption)
So all stock in PSA has Availability Group 003 (wgich means stock type P2)
But I can't do consumtion for this stock, because I have F2 in my production material request document.
BR
Denis
PS. maybe it is important, but I'm using EWM 9.2