We have a plant with one storage location 0001 (WM) when its requested WH personal transfers bin to bin material from the warehouse to the storage bins on production floor. The plan is to have an external warehouse that can supply our internal warehouse with automatic transfer requerimients, like a kanban with an empty or full signals.
How can I set up the system to generate automatic requirements from these two warehouse? The idea is when the internal warehouse is running low in components a kanban card can be scan an this will trigger a automatic transfer requeriment to the external warehouse to supply material.
thanks.