Hi,
it is NOT the AutoLB Flag, which is wrong, but the Prod/HU WT Flag.
From the list you wrote of the steps which are happening I would say even that this is not in the second, but in the first line, but also the way you have it, is not how you want it.
The way you need to set this up:
No | Step | Auto WT | Prod/HU WT |
---|---|---|---|
1 | ZB01 | x | |
2 | IPK1 | x | |
3 | IPT1 | x |
Through this the last WT is created after you confirm the process step at the packaging work center.
Brgds
Juergen