Quantcast
Channel: SCN: Message List - SAP Extended Warehouse Management (SAP EWM)
Viewing all articles
Browse latest Browse all 5578

Re: POSC + LOSC ending at ID Point storage Type for Inbound

$
0
0

Yes Juergen , the problem is exactly there. But I am not sure how do I create Putaway WT at a later stage ..... My POSC is standard :

 

Unloading

Packing

Putaway

 

as per the steps assigned in POSC ...

 

The tasks are created in sequence , but first two warehouse tasks are created simulataneously ( for Unloading -open WT  and putaway - in waiting -B). How do I shift creation of Putaway warehouse task at a later stage ?  Putaway WT is anyways 3rd in sequence ...and Auto flag is not selected for that.

Is it controlled by sequence .....below in table ...

 

Assignment of the storage process steps to the storage process:

 

Sequence No.

Step

Auto

Prod/HU WT

Duration

1

ZB01-unload

Selected

Deselected

5

2

IPK1-Pack

Selected

Selected20

3

IPT1-Putaway

Deselected

Deselected

30

 

it looks sequence no. needs to be changed ....I will try by changing sequence and check.

 

Thanks for exactly pointing out what is going wrong.

 

Regards / Vinod Sedani


Viewing all articles
Browse latest Browse all 5578

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>